The Hidden Cost of Waiting to Remodel
    Back to Education CenterBasement Finishing & Remodeling

    The Hidden Cost of Waiting to Remodel

    January 8, 2026 Aaron Harshaw

    You've been thinking about that kitchen remodel for months. Your bathroom needs updating. The deck is showing its age. But you're waiting, waiting for prices to come down, waiting for the "right time," waiting for things to get back to normal.

    Here's the truth no one wants to hear: Normal isn't coming back. And waiting is costing you thousands of dollars.

    The Numbers Don't Lie: Pre-COVID vs. Today

    Overall construction materials are up 40-50%. Concrete is up 39%. Cabinets and millwork up 25%. Iron and steel products up 83% at peak. Labor costs are up 21% since 2019, with total worker compensation up 28% over five years.

    What This Means for Real Projects

    • Kitchen Remodel: 2019 average $45,000 → 2025 same kitchen $63,000-$67,500 (+$18,000-$22,500)
    • Bathroom Renovation: 2019 average $29,000 → 2025 same bathroom $40,600-$43,500 (+$11,600-$14,500)
    • Deck Construction: 2019 average $32,000 → 2025 same deck $44,800-$48,000 (+$12,200-$16,000)
    • Basement Finishing: 2019 average $68,000 → 2025 same basement $95,200-$102,500 (+$27,200-$37,400)

    Why Waiting Won't Save You Money

    Construction costs are forecast to increase another 5-7% in 2026. Building materials continue rising 3-4% annually. Labor costs are projected to increase 4-5% annually due to persistent worker shortages.

    Even a two-week delay can cost 5-8% more on your project. On a $40,000 kitchen, a two-month delay could add $2,000-$3,200. Wait six months? $4,000-$6,000 more.

    The 'Return to Normal' That Isn't Coming

    • Labor shortage persists, the industry needs 740,000 workers per year just to meet demand
    • Material costs have stabilized high, most remain dramatically higher than 2019
    • Inflation compounds, 4-6% annual increases are the new normal
    • New baseline established, the industry operates at these price levels now

    More Than Just Money

    Every month you delay is another month fighting with outdated, inefficient layouts. Dealing with worn cabinets and appliances. Missing out on the joy of a space you love. Losing money on utility bills from inefficient systems.

    Smart Strategies for Today's Market

    • Lock in pricing now, once materials and scope are finalized, order everything to lock in today's costs
    • Prioritize and phase, kitchen or bathrooms first, then basement or deck in 6-12 months
    • Make strategic material choices, timeless designs over trendy, invest in quality where it matters
    • Bundle projects, kitchen + bathrooms or whole home packages offer better pricing

    The Bottom Line

    Would you rather pay $63,000 for your dream kitchen today, or $88,000-$94,000 for the same kitchen in 12-18 months? The best time to build was five years ago. The second-best time is today.

    Ready To Start Your Project?

    No pressure, just an honest conversation about your home.

    Let's Start A Conversation